Ultra Spacer Hampton Jenny #1

Well Information

Harden County, Tx
9-7/8
WBM
9.5 lb/gal – Lead Cement: 16.4 lb/gal
30 min @ 10.5 lb/gal

Challenge

The objective was to prevent loss circulation and maximize isolation across
production sands.

Results

The entire interval was cemented without loss circulation resulting in
good isolation across the production sands, as indicated by CBL
data.