Poly Plug GOM Deep Water

Well Information

GOM Deep Water
14
Synthetic OBM
15.0 ppg
150 F
5 hrs

Challenge

The operator blended a 200 bbl Poly Plug pill with 20 ppb 20/40 frac sand and
spotted and squeezed the pill into a ballooning formation with some loss’s
occurring. The Poly Plug pill was spotted and squeezed with 120 psi of pressure
noted and held for 8 hours. Operations continued with no further loss’s.

Results

No further loss’s occured and no ballooning of the formation was
noted.