Ultra Spacer Well #3

Well Information

West Cameron 295
14-3/4″
WBM
12.4 lb/gal-Lead Cement Slurry: 16.4 lb/gal
60 Minutes @ 14.0 lb/gal

Challenge

The objective was to achieve optimum mud/filter cake removal, reduce gas
migration and reduce the risk of loss circulation during the cement displacement.

Results

Excellent mud cleaning/filter cake removal was observed at the flow
line, the entire interval was cemented without any incidence of loss
circulation.